Mine sites by closure and rehabilitation status
Measurement answer
What this metric measures
Reports the number and percentage of mine sites with closure and rehabilitation plans, actively undergoing closure and rehabilitation, and closed and rehabilitated with post-completion monitoring in place.
Specification
Metric specification
- Result format
- Structured table
- Unit
- count; % — source-defined reporting unit
- Reporting basis
- Reporting period used by the reporting organization.
- Aggregation
- Count mine sites in each reported status and calculate each status percentage against the total number of mine sites in the reporting boundary; retain overlapping categories rather than summing them.
- Pillar
- Environmental
- Topic
- Mine closure, rehabilitation and post-closure monitoring
- Controlled domain
- Nature, biodiversity and land
- Entity type
- Metric
Reporting boundary
Mine sites included in the reporting organization's disclosed reporting boundary.
Verified source occurrences
Framework coverage
This is one canonical metric. The bindings below show every verified framework occurrence without creating duplicate metric pages. Edition, disclosure, role, and relationship remain source-specific.
- Adopting Disclosuremine-site-closure-rehabilitation-status
CDP Full Corporate Questionnaire 2026
- Publisher
- CDP
- Edition
- Full Corporate Questionnaire and Reporting Guidance 2026 v1.3, revised 6 August 2026
- Requirement
- Conditional
- Relationship
- Reuses Canonical Metric
- Mapping outcome
- Reused
- Source locator
- Q11.16.1, numeric field 1 | Q11.16.1, numeric field 2
- Adopting DisclosureSource evidence
TNFD sector guidance
- Publisher
- Taskforce on Nature-related Financial Disclosures
- Edition
- Final English sector guidance collection through August 2026 (17 documents)
- Requirement
- Not Specified
- Relationship
- Defines Disclosure
- Mapping outcome
- Direct Evidence
- Source locator
- TNFD additional sector guidance, Page 88, sector metric table, metric MM.A23.3 | Source evidence: number and percentage of mine sites with closure and rehabilitation plans, actively undergoing closure and rehabilitation, and closed and rehabilitated with post-completion monitoring; categories may overlap. | Page 88, sector metric table, MM.A23.3
- Adopting DisclosureMM.A23.3
TNFD sector guidance
- Publisher
- Taskforce on Nature-related Financial Disclosures
- Edition
- Version 1.0, June 2024
- Requirement
- Recommended
- Relationship
- Maps Source Identity
- Mapping outcome
- Published
- Source locator
- Page 88, sector metric table, MM.A23.3
Value structure
Dimensions and units
- Unit
- count; % — source-defined reporting unit
- Reporting basis
- Reporting period used by the reporting organization.
Unit meaning: Values use count; % under the disclosed TNFD sector-guidance method, reporting period and boundary.
Table fields and units
- Closure and rehabilitation status
- Number of mine sites
- Percentage of mine sites
- Whether post-completion monitoring is in place
- Explanation of category overlap
Published dimensions
- Closure and rehabilitation status
- Mine site
- Post-completion monitoring status
- Count of mine sites
- Percentage of mine sites
Disclosure method
Formula information
- Status
- Not applicable
- Formula type
- Structured Disclosure
Disclosure form
No single formulaReport the source-defined result with its stated fields and method disclosures. MM.A23.3 specifies reportable site counts and percentages across three explicit closure and rehabilitation statuses. It is a standalone structured outcome metric, not a generic impact-management narrative. The potentially overlapping status categories are retained as a material method characteristic.
Verified sources
Evidence and status sources
Sustopedia checked each record-specific claim directly against primary publisher material. Labels distinguish current measurement authority from future compatibility and corroborative, legal, edition, or method status context. Corroborative evidence can support a stated limitation but cannot establish the core measurement by itself.
Measurement evidence
- Measurement evidenceChecked 30 August 2026
TNFD additional sector guidance collection
- Publisher
- Taskforce on Nature-related Financial Disclosures
- Edition
- Final English sector guidance collection through August 2026 (17 documents)
- Locator
- TNFD additional sector guidance, Page 88, sector metric table, metric MM.A23.3 | Source evidence: number and percentage of mine sites with closure and rehabilitation plans, actively undergoing closure and rehabilitation, and closed and rehabilitated with post-completion monitoring; categories may overlap. | Page 88, sector metric table, MM.A23.3
Supports: The official TNFD sector guidance supports the identity, boundary and method basis of “Mine sites by closure and rehabilitation status”.
Open official source
Use with context
Interpretation boundaries
Method disclosures required
Source-edition basis: TNFD sector guidance, Final English sector guidance collection through August 2026 (17 documents).
- Definition of a mine site and mine-site reporting boundary.
- Definitions of closure plan, rehabilitation plan, active closure and rehabilitation, closed and rehabilitated, and post-completion monitoring.
- Whether and how the reported status categories overlap.
- Denominator used for each reported percentage.
Record-specific limitations
- The three status categories may overlap and therefore counts and percentages across categories must not be summed.
- Comparability depends on the organization's definitions of closure, rehabilitation, post-completion monitoring and the mine-site reporting boundary.
- A site may be represented in more than one status where the reported status definitions permit overlap.
Interpret this metric with the stated reporting boundary, period convention, value shape, and unit. Results prepared with different boundaries or conventions may not be directly comparable.
Measurement evidence supports the core record-specific claims described above. Corroborative evidence can support limitations, while compatibility and status sources provide their separately labelled context. None of these cards by itself determines an organisation's legal applicability, filing readiness, assurance status, or compliance conclusion.