Purchased electricity, heat, steam and cooling use
Measurement answer
What this metric measures
Purchased electricity, heat, steam and cooling consumption is externally sourced electricity and thermal energy acquired and consumed in own operations, with carrier and renewable-origin basis kept separate.
Specification
Metric specification
- Result format
- Structured table
- Unit
- Structured table — see field-level units
- Reporting basis
- Reporting-period flow
- Aggregation
- Compatible carrier rows only; alternative accounting bases remain separate
- Pillar
- Environmental
- Topic
- Purchased electricity and thermal energy
- Controlled domain
- Energy
- Entity type
- Metric
Reporting boundary
Electricity, heating, steam and cooling acquired from outside the organizational boundary and consumed in owned or controlled operations. Purchased fuel is excluded, and supply routes or contractual instruments cannot overlap.
Verified source occurrences
Framework coverage
This is one canonical metric. The bindings below show every verified framework occurrence without creating duplicate metric pages. Edition, disclosure, role, and relationship remain source-specific.
- Adopting Disclosurepurchased-electricity-heat-steam-and-cooling-consumption
CDP Full Corporate Questionnaire 2026
- Publisher
- CDP
- Edition
- Full Corporate Questionnaire and Reporting Guidance 2026 v1.3, revised 6 August 2026
- Requirement
- Conditional
- Relationship
- Reuses Canonical Metric
- Mapping outcome
- Reused
- Source locator
- Q7.30.15, numeric field 1 | Q7.30.17, numeric field 1
- Adopting Disclosurepurchased-electricity-heat-steam-and-cooling-consumption
GRI 103: Energy 2025
- Publisher
- Global Reporting Initiative
- Edition
- GRI 103: Energy 2025; effective 1 January 2027
- Requirement
- Conditional
- Relationship
- Reuses Canonical Metric
- Mapping outcome
- Reused
- Source locator
- Disclosure 103-2-b, PDF page 9
- Adopting DisclosureSource evidence
GRI Standards
- Publisher
- Global Reporting Initiative
- Edition
- Current edition effective through 31 December 2026
- Requirement
- Not Specified
- Relationship
- Defines Disclosure
- Mapping outcome
- Direct Evidence
- Source locator
- Effective-date cover; Disclosures 302-1, 302-3 and 302-4
Value structure
Dimensions and units
- Unit
- Structured table — see field-level units
- Reporting basis
- Reporting-period flow
Unit meaning: This metric is reported as a structured table; each field carries the unit stated in the table fields below.
Table fields and units
- Electricity, heating, cooling or steam carrier and renewable or non-renewable source
- Purchased or acquired route and contractual-instrument quality
- Energy consumed (MWh — megawatt-hours of purchased or acquired final energy; 1 MWh = 1,000 kWh)
- Location-based or market-based basis, attribute ownership, facility and country
- Reporting period, method edition and missing-value reason
Published dimensions
- Purchased energy-consumption row
- Electricity, heating, cooling or steam carrier
- Renewable or non-renewable source class
- Detailed energy source
- Purchased or otherwise acquired route
- Location-based or market-based basis
- Contractual-instrument type and quality
- Facility and country
- Reporting method edition
Disclosure method
Formula information
- Status
- Not applicable
- Formula type
- Structured Disclosure
Disclosure form
No single formulaPopulate the structured fields from qualifying source observations and retain each field-level unit, boundary, status, and method; do not collapse the disclosure into one calculated value.
Verified sources
Evidence and status sources
Sustopedia checked each record-specific claim directly against primary publisher material. Labels distinguish current measurement authority from future compatibility and corroborative, legal, edition, or method status context. Corroborative evidence can support a stated limitation but cannot establish the core measurement by itself.
Measurement evidence
- Measurement evidenceChecked 15 August 2026
GRI 302: Energy 2016
- Publisher
- Global Reporting Initiative
- Edition
- Current edition effective through 31 December 2026
- Locator
- Effective-date cover; Disclosures 302-1, 302-3 and 302-4
Supports: Official publisher reference linked specifically to the Sustopedia metric “Purchased electricity, heat, steam and cooling use”; interpret it with the source-edition basis and limitations shown on this page.
Open official source
Use with context
Interpretation boundaries
Method disclosures required
Source-edition basis: Binding Commission Delegated Regulation (EU) 2023/2772 consolidated 1 January 2025, ESRS E1-5 paragraphs 37(c)(ii) and 38(e), AR32 and AR34, plus current GRI 302: Energy 2016; the July 2026 ESRS annex and GRI 103: Energy 2025 are compatibility evidence only.
- Electricity, heating, cooling or steam carrier
- Renewable or non-renewable class and detailed source
- Purchased or otherwise acquired route
- Energy consumed in MWh, spelled out as megawatt-hours of purchased or acquired final energy
- Location-based or market-based basis
- Contractual-instrument type, quality state and attribute ownership
- Facility, country, reporting period and method edition
- Purchased-fuel exclusion and overlapping-procurement controls
- Unavailable and unclassified values with reasons, never silently represented as zero
Record-specific limitations
- Purchased energy here excludes purchased fuels, which remain in the fuel-consumption record.
- A renewable contractual claim depends on attribute quality, ownership, market boundary and timing.
- Location-based and market-based alternatives are not additive.
- Utility supply, power-purchase agreements, green tariffs and unbundled certificates can overlap without procurement controls.
Interpret this metric with the stated reporting boundary, period convention, value shape, and unit. Results prepared with different boundaries or conventions may not be directly comparable.
Measurement evidence supports the core record-specific claims described above. Corroborative evidence can support limitations, while compatibility and status sources provide their separately labelled context. None of these cards by itself determines an organisation's legal applicability, filing readiness, assurance status, or compliance conclusion.